[1]
H. Gaspars-Wieloch, “A Method of Reducing the Cut of Inadmissible Paths as a Tool for Optimizing the Time-Cost of a Project”, SOEP, vol. 1, no. 10, pp. s. 26–45, Oct. 2013, doi: 10.18559/dx3rda82.